Generating electricity with capacity of 2115MW to satisfy energy needs in Tanzania Control water flow in the period of flooding and thus providing the necessary water requirement
Contributing to the delivery of electricity to 17 million Tanzanian families and achieving an industrial renaissance that pushes the Tanzanian economy towards the horizons of sustainable development
Controlling the flood to ensure permanent water availability throughout the year