The Western El Fant Village Wastewater Station in Beni Suef - Egypt
Water & Wastewater
:: Completed Projects
:: 2025 ::
Total cost of LE 30 million
The project serves 13,750 people in Western El Fant Village as part of the national wastewater project for the villages of Beni Suef.
It includes a 66-litre/second lifting station, gravity networks with a total length of 7,150 metres and diameters ranging from 160mm to 500mm, and a 400mm external diameter HDPE force main with a length of 3,800 metres from the western El Fant lifting station to the existing Saft El Nour lifting station to the permanent El Fashn treatment plant.