Belfia and Beni Hamad Wastewater Station in Beni Suef - Egypt
Water & Wastewater
:: Completed Projects
:: 2025 ::
Total cost of LE 60 million
The project serves 50,000 people in Belfia and Beni Hamad, as part of the national wastewater project for Beni Suef villages.
The project includes a 150 litre/second capacity lifting station, gravity networks with a total length of 24,000 linear metres and diameters ranging from 160 mm to 700 mm, and HDPE force main with an internal diameter of 500 mm and a length of 4,770 metres from Belfia lift station to the existing Beni Affan lift station.