• Home / /
  • Projects / /
  • Al Zainiya Wastewater Station in Luxor

Al Zainiya Wastewater Station in Luxor - Egypt

Water & Wastewater   ::  Completed Projects   ::  2024  ::  

The station consists of buildings for pumps, transformers, generators, an administrative building, a warehouse, a security room, as well as gravity networks with a length of 11.2 km, a 710 mm diameter HDPE force main with a length of 5.44 km, and (4) vertical pumps discharging 146 l/s with a lift of 22 meters, in addition to a generating unit with a capacity of 350 kVA, a 600 mm diameter pump discharge line, electrical panels, measuring devices, and a water hammer. The work cost reached LE 180 million.

Water & Wastewater