Maasara Abou Seer Wastewater Station in Beni Suef - Egypt
Water & Wastewater
:: Completed Projects
:: 2025 ::
Total cost of LE 27 million
The project serves 25,000 people in Maasara Abou Sir, as part of the national wastewater project for Beni Suef villages.
includes a 60 litre/second capacity lifting station, gravity networks with a total length of 11,000 linear metres and diameters ranging from 160 mm to 500 mm, and a GRP force main with an internal diameter of 350 mm and a length of 3,500 metres from Maasara Abou Seer lift station to Abu Seer Al Malq treatment plant.