Bridges of the Middle Ring Road (intersections of Helwan and Autostrad) - Egypt
Roads
:: Completed Projects
:: 2022 ::
Client: General Authority for Roads and Bridges
Executing Agency: Military Engineers Department
Contractor: The Arab Contractors Company
Consultants: ACE Moharram-Bakhoum and Osama Oqeel
Estimated Value: 2,750,000 billion EGP.
Starting Date: 1st June 2017
The project consists of 4 main sectors;
The 1st sector: the tunnel of the intersection between the Middle Ring Road and the Autostrad, with 52 m length and 40 m.
The 2nd Sector: the intersection between the Middle Ring Road and Metro with 880 m length and 40m width.
The 3rd Sector: El Masaken Bridge (Ezbet Al Walda) with 1200 m length and width 40 m.
The 4th Sector: the intersection between the Middle Ring Road and the Nile River, it is 570m length and 40m width.
The axis bridge of the Middle Ring Road is linking between Ain Soukhna Road and Misr/Fayoum Desert Road; with total length of 5km (bridges extends for 3km + roads extends for 2km) and width varied from 40m to 47m. It is divided into 4 lanes on each direction. In addition to a services road under the bridges with 3 lanes on each direction.