Infrastructure at Utako District - Abuja - Nigeria
Roads
:: Completed Projects
:: 2007 ::
The design and construction of infrastructure works includes sanitary drainage networks and storm water drainage from RC and PVC pipes 66 000m long. The project includes water supply networks in cast iron steel with total length 45 000m , principal and secondary roads, electricity and lighting networks, transformer station 33/11 KV, electrical installation, concrete corridors , 495 000 m² parking area and landscaping.