Guelengdeng-Bongor Road - Chad
Roads
:: Completed Projects
:: 2019 ::
The rehabilitation of the existing road with 83km length and 10m width. It has cold asphalt surface layer and renewed with hot asphalt surface layer with 7m width, 5cm thickness with 1.5m shoulders on both sides and the construction of a foundation layer with 20cm thickness. Besides, the construction of a 10km asphalt road (hot asphalt) inside Bongor. In addition to the supplying, installation and operation works of the lighting poles.