Osim Potable Water Plant – 1st Phase (60,000 m3/day) in Giza - Egypt
Water & Wastewater
:: Completed Projects
:: 2024 ::
Starting date: 1/2/2018.
Owner: The Construction Authority for Potable Water and Wastewater (CAPW).
Main contractor: The Arab Contractors (Osman Ahmed Osman & CO.) -Helwan Branch – Electromechanical Projects Department.
Owner Consultant: Dr. Hamdy Ibrahim Office.
Company Consultant for civil works: INFRA ENGINEERING - Dr. Moustafa Ashmawy
It consists of the main plant and intake, and 4 modules consisting of (2 filter - 1 filter - 4 filters) with a capacity of 15,000 m3/day for each module, a ground tank - a room for filtered water pumps - a room for chemicals (alum - chlorine) - a sludge treatment system - the station laboratory - the warehouse - the workshop - the transformer building - the generator building, and the water transmission line from the plant to Al Mansouriya Village with a total length of 9.8 km, and a 1000 mm diameter cast iron water line with a length of 1.8 km, and a 600 mm diameter polyethylene water line with a length of 8 km, in addition to the second phase, which will have a capacity of 60,000 m3/day, thus the total capacity of the plant will be 120,000 m3/day. The civil works for the intake for the entire plant has been completed with a design capacity of 120,000 m3/day.