  • secondary school for boys in Eastern Fujairah

secondary school for boys in Eastern Fujairah - UAE

Educational Buildings   ::  Completed Projects   ::  2015  ::  

Construction and execution of a secondary school for boys in Eastern Fujairah (first stage) Fujairah, United Arab of Emirates
: Construction the school main building, the service buildings and foundation works with area about 10,000 m2
The school consists of ground floor, first floor, a roof, and (27) classrooms. Civil works , internal and external finishes include: construction and equipping of (3) complete laboratories with all laboratory equipment and furniture - a library with all furniture and equipment - a prayer hall for students – steel skelton works for the service buildings - Fabric Shed works to cover the school yard with area of about 1200 m2 - Installation of (2) Skylights. - execution of the external school fence of the with length of about 700 m.L and includes (4) automatic iron gates – gymnasium hall including steel works to cover the ceiling of the hall, in addition to constructing 3 rows of the amphitheater with a capacity of 500 people, equipping the music hall and insulating works for walls, agriculture works and green areas in the site, and all the doors are fire-resistant .landscaping works: including execution of interlocking works and kerbstones for pedestrian sidewalks, road planning and car parking . Electrical works: (2) transformers with a capacity of 1500 KVA and there is a backup generator with a capacity of 340 KVA. The building is divided from the inside into four sections A, B, C, D, and each section has its own electrical room - There is one (1) elevator with a capacity of 10 people - Execution of light current works. Mechanical and sanitary works: - including central air-conditioning and ventilation - There is a system for Fire resistance - water pumps and a ground water tank with a capacity of 48000 gallons and (2) elevated tanks with a capacity of 1650 per person.
Value: 7,486,353 US$
Completion Date: 2013