secondary school for girls in  Al-Qarayen - Sharjah - UAE
                    
                    
                        Educational Buildings
                          ::  Completed Projects
                          ::  2015  ::  
                    
                    
                    
                    
                        
                            Construction of a secondary school for girls in  Al-Qarayen - Sharjah (first stage) Sharjah, United Arab of Emirates  
   Construction the school main  building, the service buildings and foundation works  with area about 10,000 m2 .  
  The school consists of ground floor, first floor, a roof,  and (27) classrooms. Civil works , internal and  external finishes include: construction and equipping  of (3) complete laboratories with all laboratory  equipment and furniture - a library with all furniture  and equipment - a prayer hall for students – steel  skelton works for the service buildings - Fabric Shed  works to cover the school yard with area of about 1200  m 2 - Installation of (2) Skylights. - execution of the  external school fence of the with length of about 700  m.L and includes (4) automatic iron gates –gymnasium  hall including steel works to cover the ceiling of the  hall, in addition to constructing 3 rows of the  amphitheater with a capacity of 500 people, equipping  the music hall and insulating works for walls,  agriculture works and green areas in the site, and all  the doors are fire-resistant .landscaping works:  including execution of interlocking works and  kerbstones for pedestrian sidewalks, road planning and  car parking . Electrical works: (2) transformers with a  capacity of 1500 KVA and there is a backup generator  with a capacity of 340 KVA. The building is divided  from the inside into four sections A, B, C, D, and each  section has its own electrical room - There is one (1)  elevator with a capacity of 10 people - Execution of  light current works. Mechanical and sanitary works: -  including central air-conditioning and ventilation -  There is a system for Fire resistance - water pumps  and a ground water tank with a capacity of 48000  gallons and (2) elevated tanks with a capacity of 1650  per person. 
  Value: 8,600,730 US$  
  Completion Date: 2015