Upper Egypt Free Road - Egypt

Roads   ::  Completed Projects   ::  2011  ::  

Owner: Department of Military Engineering
The Consultant: Engineering Consulting Office of the Military Technical College
Type of contract: tender
The project comprises three sectors:
I] Third sector Project
Project Value: 170,935,693 pounds
II] Second sector Project
Project Value: 101,987,714 pounds
III] First sector Project
Project Value: 10,044,397 pounds
Description:
Road leading from 38th Km ending at 83rd Km is 45Km length and 14.5 m width, It is divided into three lanes (3.75 width) and 2 side shoulders (right shoulder width is 2. 5m and left shoulder width is 0.75m) There are 6 sets of on-road services: 2 are located on the 2nd sector and 4 on the third one.
There is also a runway located in the third sector at station 58. Opening Tepe is built at the end of the rocky wall at station 800+54. 8 road strips are installed in the third sector : 4 strips in Sheikh Fadl Tunnel at station 500+60, and another 4 in El Bostan Tunnel at station 500+79 Some parts of El Bostan Access Road (8m Width) are constructed at station 500+79.