The water level measurement and drainage station in Nimule - South Sudan
Agriculture & Irrigation
:: Completed Projects
:: 2019 ::
Project Objective: construction of a a water level measurement station on the Nile River as part of technical cooperation projects with SouthSudan. The works include a Nile gauge, an administrative and residentialbuilding, a concrete wall, and buildings around the station to assist in theearly flood warning process.
Project components:
- Engineers Residence Building (a hall, 2 rooms, kitchen and bathroom)
- Adjoining building. (a hall, 2 rooms, kitchen and bathroom)
- The main gate.
- Two green areas.
- Manhole.
- Drainage tank.
- A wall of buildings.
- Elevated water tank.
- Water well.
- Sub-gate.
- Guard room.