Eng. Sayed Farouk – CEO and Chairman of the Arab Contractors Company was on an inspection tour for the development of Sharm El Sheikh International Airport which is one of the most important projects implemented by AC in Sharm El Sheikh. Eng. Sayed Farouk was accompanied by Eng. Emam Afify – Vice Chairman, Eng. Samir Saad Allah – Member of the Executive Board supervising Canal and Sinai Sector who declared that the development project of passenger terminal No. 2 at Sharm El Sheikh International Airport has a contractual value of 450 million LE. The project includes civil, construction and architectural works for the expansion of the terminal and the addition of 6 areas to the existing terminal with a total area 12,000 m2. Besides, the development works includes the electrical works, light current work, acoustics, central conditioning, network of the firefighting, alarming and sanitary works for the new areas, the development of the existing toilets and of the rainwater drainage network.
They were accompanied by Eng. Salam Rashad – Manager of Electromechanical Projects for Public Buildings and Utilities, Eng. Mohamed Khedr – Manager of Electrical Works Department, Eng. Hossam Zakaria – Manager of Sharm El Sheikh Projects, Eng. Sayed Abdullah – Manager of Equipment Affairs in Sinai Branch, Eng. Mohamed Kamel – Manager of Safety and Occupational Health in Sinai Branch and Eng. Amr Shokr – Project Manager.