Eng. Sayed Farouk – CEO and Chairman of the Arab Contractors Company was on an inspection visit to the development works of Sharm El Sheikh International Airport which is considered one of the most important projects implemented by the Arab Contractors Company in Sharm El Sheikh. He was accompanied by Eng. Samir Saad Allah – Head of Sectors supervising Canal and Sinai Sector, Eng. Ahmed Gamea – Sinai Branch Manager who declared that the development project of Sharm El Sheikh Airport – Terminal 2 with a contractual value of 450 million L.E. includes civil, construction and architectural works of the terminal expansion and addition of 6 areas to the existing terminal with a total area 12000m2.
Eng. Hossam Zakaria – Manager of Sharm El Sheikh Projects declared that the works include electrical works, low voltage works, sound systems, central air condition, firefighting and alarm network, sanitary works for the newly added areas, development of the existing WCs and rainwater drainage system.