Eng. Sayed Farouk – CEO & President of the Arab Contractors Company visited Cairo Metro Line 4 project. He inspected the excavation works as a preparation to construct the diaphragm walls in Pyramids station no. (6). Besides, he visited the stations of Grand Egyptian Museum no. (4). He was accompanied by Eng. Tarek Saqr – AC Board Member, Eng. Mohamed Abou Deshish – Supervisor of the Project, Eng. Abeer Morsi – Project Manager and Eng. Hesham Ali – Deputy Manager of Maritime Structures Department. It is a noteworthy that Cairo Metro Line 4 – Phase 1 with a length of 18.8 km and includes 12 stations: Hadayek El Ashgar - Hadayek El Ahram – El Nasr - Grand Egyptian Museum - El Remaya Square – El Ahram – El Marrioutiya – Al Areesh – El Matbaa – El Talbiya – Madkour - El Mesaha Square. The Arab Contractors Company “the Consortium Leader” which includes (Petrojet, Concord and Hassan Allam Sons) is carrying out 3 stations of Grand Egyptian Museum – El Ahram – El Talbiya. It is noteworthy that Cairo Metro Line 4 is the base for linking 6 October City and New Cairo with the Metro network. It provides transportation service for the high density population areas in El Haram – Faysal – El Omraniya – Giza - Nasr City – Al Azhar University – New Cairo. It is expected to transport 2 million passengers daily. In addition to these, the transport service will integrate with the Monorail of 6 October City.