Eng. Mohsen Salah – CEO and Chairman of the Arab Contractors Company accompanied by Eng. Sayed Farouk – Senior Vice Chairman of the AC and Eng. Ahmed Abbass – the AC Board Member inspected the work progress of the Parliament Building in the New Administrative Capital. He inspected the facades and interior finishing works for ceilings, walls and floors in relation to paints and installation of ceramic, porcelain, central air conditioning systems and fire-fighting networks and electricity in the building. This was in the presence of the head of sectors, managers of the participated departments and branches in the project implementation. It is a noteworthy that the Parliament Project is built upon 225.000m2 and consisting of the main building of 112.000m2 which includes: a basement, a ground floor, 8 typical floors, 2 domes with 50m diameter, a main hall with a capacity up to 1000 members and administrative offices. It includes a number of the services buildings of: (medical center – security building – electricity station – electromechanical building – firefighting station – car parks accommodates 675 cars; in addition to the fencing works, the interior roads and the green areas.