Eng. Mohsen Salah – CEO and Chairman of the Arab Contractors Company inspected the implementation progress of the Parliament Building in the New Administrative Capital. This was in the presence of Eng. Emam Afify –Vice Chairman of the AC, Eng. Ahmed Abbass – the AC Board Member, Eng. Sayed Shendi – Head of Greater Cairo Sector, Eng. Mahmoud El Sharnouby – Head of Electromechanical Works Sector, Eng. Mamdouh Zebib – Assistant of the Head of Greater Cairo Sector, Eng. Mohammed Elwi – Manager of the Distinguished Buildings Department, Eng. Mohammed Lasheen – Manager of Cairo Branch and Eng. Mohammed Khedr – Manager of the Electrical Works. It is a noteworthy that the New Parliament Building is built upon 126000m. It consists of the main building, the service building and the landscape works which includes the fences, internal roads and the green areas. The main building is built on 18000m; it comprises a basement, a ground floor, 8 typical floors, a dome with 50m diameter, the main hall accommodates of 1000 member and the administrative offices. The services buildings (a mosque accommodates 300 persons –hospital with 50 beds capacity – police station – firefighting station - civil and real estate registrar for employees - building dealing with the public - walls length 1400 m long - guard towers - 8 entrances - front fountain). Besides, two-storey garage which built on 40000m and accommodates 1500 cars. The project is characterized that all the used materials are local manufacturing and equipped with the latest systems of lighting, alarm, fire –fighting and central air conditioning. The concrete structure of the main building is finalized and will be finished and equipped according to the highest standards of the modern governmental buildings.