Major Gen. Eng. Ihab Khedr – the Head of the National Organization for Potable Water and Sanitary Drainage (NOPWASD) and Eng. Emam Afify – Vice Chairman of the Arab Contractors Company visited the projects of: Al Mostakbal Water Station, Al Sabaa Abar Drainage and Abou Sweer Drainage in Ismailia. They were accompanied by Eng. Mohammed El Hosseiny –Member of the AC Executive Board, Eng. Mohammed Hafez – Head of Canal and Sinai Sector, Eng. Mahmoud El Sharnouby – Head of Electromechanical Projects Sector and Eng. Ihab Gamal – Manager of Canal Branch. Eng. Ihab Gamal declared that the works of Al Mostakbal Water Station (capacity of 34000m3) is completed and it will operate by the end of the current April. Its total cost is 300 million EGP. The final finishing work is ongoing for Al Sabaa Abarr Wastewater Station(capacity of 10000m3)and Abou Sweer Wastewater Station which includes 2 pumping stations,drain lines and regression networks as a preparation to enter into services by the end of the next May.