Minister of Housing toured the utilities and pumping station of Ebne Betak project and stressed on accomplishing it within 3 months. AC Cairo Branch Manager stated that the project total cost is EGP 400 million. The project scope of work is the execution of 15.000 housing units built upon 1360 feds. The project includes the building of a wastewater networks with a total length 97km; drain lines 9km, 4 pumping stations, roadways 122.5km length. In addition to these, the flatting and delivering of the lands and feeding lines with diameters 800mm, the transportation of the drilling works and roadworks from ElWahat roadway to the project.