Eng. Ibrahim Mahlab – Minister of Housing, Utilities and Urban Communities and Eng. Mohsen Salah – AC Chairman inaugurated Al Shorouk Pumping station and Badr City Potable Water Feeding Line executed by the AC under the supervision of Water and Wastewater Executive Authority . Eng. Salah El Zahed – Board Member declared that the project serves Badr and Al Shorouk cities with a total value EGP 160 million.
Eng. Samir Qassem – Head of Sector and Eng. Samir Mohamed Saad Allah – Manager of Canal Branch which executed the project said that the project scope of work incudes administrative building, transmission lines building, diesel generator , tanks 60000 l/month, chlorine building, pumps, store, workshops, security building, feeding line to Badr City 18.3km and 1000mm diameter.