Water Wells & Dewatering Works
Since the year 1972 the division of wells drilling and dewatering had started by a great qualified engineers and trained workers in the area of drilling production water wells and works of dewatering in all over Arab Republic of Egypt in the great projects and that depends on high technology in this area. This division is specialized in water wells to obtain underground water for all purposes to depths of 300 meters.
Eqipments
More Projects
- Dewatering of the Al-Abasa water station by using well point system.
- Dewatering by using deep well system in El-Gabal El-Asfar project-Tender 16/2.
- Dewatering by using deep well system for sewage Networks in Cairo, Beni Suef, Alex, Tanta, Aswan and Luxer.
- Dewatering of the Gulf Suez Pump station by using well point system.
- Construction of 70 deep wells up to 250 m in Salheya project.
- Construction of 22 deep wells up to 500 m in North sinaa.
- Construction of Baraka wells “Pure water well”.
- Construction of pepsi cola factory well.
- Construction of Baraka wells (pure water well).
- Dewatering of the Ayon Mosa Electrical Station be using deep wells system.
- Construction of Pepsi cola factory well.
- Construction of 70 deep wells up to 250 m in Salheya project.
- Dewatering of the Gulf Suez pump station by using well point system.
- Dewatering of the Al-Abasa water station by using well point system and deep well system.
- Dewatering by using deep well system in El- Gabal El-Asfar project-tender16/1.
- Dewatering by using deep well system for sewage networks