Rehabilitation of the airport so that it can accommodate up to 100 thousand passengers instead of 50 thousand
Qualification includes the establishment of the departure and arrival halls area 1200m2 Each hall connected by suspended link bridge between the new terminal and the old one, It include addition system (finger) to facilitate passenger movement into the airport halls.
The rehabilitation design took into account that it should be compatible with what is implemented on the external facades ,so that it includes the airport as one block between the new and the existing situation.