The Prime Minister Dr. Moustafa Madbouli inaugurated the 1st phase of Roxy Smart Parking. It is a multi-storey automated underground parking. It is considered the first smart car parking in Egypt and the Middle East. The inauguration was in the presence of the ministers of the military production and local development, Cairo Governor, Chairman of the Arab Organization for Industrialization, Eng. Mohsen Salah – CEO and Chairman of the Arab Contractors Company, South Korea Ambassador to Cairo, two former Cairo governors, deputy speaker of the House of Representatives and number of the parliamentary members. The parking consists of 4 underground floors at a depth of 16m. The project implementation is divided into 2 phases with a total area reached 10000m2, a building space of 40000m2 and will take up a total of 1,700 cars. The first phase is completed; its total area reached 5300m2, a building space of 21000m2 and its capacity is 900cars. The second phase is expected to be completed in December 2020. During the project implementation there were utilities diversion works for water, wastewater, electricity, telephone lines, and natural gas networks away from the work site. Besides, ensuring the safety of the existing buildings in the work site which has a distinguished architectural style to avoid any damages that may occur to it. The car parking has modern security cameras system in all the floors, gates for entry and exit. Roxy Smart Parking is equipped with 6 robots to park vehicles, transferring them to the span inside the garage, the vehicle storage and recall time takes 3-6 minutes, and there are 3 exits and 3 entrances. Additionally, there are 6 elevators for vertical movement among the floors.