Eng. Mohsen Salah – the Chairman of the Arab Contractors Company and Major Gen. Emad Saafan –Assistant Manager of the Military Engineers Department were in an inspection tour for Al Fatah Al Aleem Mosque in the New Administrative Capital to follow up the ongoing finishing works. The visit was in the presences of Eng. Sayed Farouk – AC Senior Vice Chairman and Eng. Ahmed Abbass – AC Board Member, Eng. Mofida Allam – the Roads Consultant in the AC and Supervisor of the Laboratory Sector, Eng. Mahmoud El Sharnouby – Head of Electromechanical Projects' Sector, Eng. Mohammed Youssef – Supervisor of the Electrical Works Department, Eng. Mohammed Khedr – Manager of the Electrical Works Department, Eng. Tarek Marzouq – Manager of the Sanitary Works and Finishing Department and Eng. Hany Maher – the Project Manager. It is a noteworthy that the mosque accommodates 17 thousands prayers. The project is consisting of: a basement on a total area of 6325m2, a ground floor built upon 6325m2 and accommodates more than 6300 prayers – 6 entrances – aside entry for the women in the First floor – external area for praying accommodates 3400 prayers; a basement includes praying area for men (1200 prayers), a praying area for women (300 prayers), 2 ablutions for men and the same for women - Quraan Memorization House. In addition to these, the mosque includes 4 minarets 90m for each one, a main dome for the mosque nave 33 m diameter and 28 m height, 4 secondary domes with 12.5m diameter and 10 m height.