Eng. Mohsen Salah – AC Chairman toured New El Alamein City, he listened to an explanation about the different projects which executed by the Arab Contractors Company. He visited the work sites and inquired about all the execution details and the time schedules for the projects. He was accompanied by Eng. Sayed Farouk – the Senior Vice Chairman, Eng. Emam Afify – Vice Chairman, Mr. Hossam Imam – Vice Chairman, Eng. Hossam El din El Reefy – Board Member, Eng. Mofida Allam – AC Consultant for Roads Projects and Supervisor of the Laboratory Sector, Eng. Ayman Attia – Manager of Alexandria Branch and a number of the heads of sectors and managers of the department which contributing in the projects. It is a noteworthy that the AC is executing the touristic path 7km length as a First Phase, besides the waves' barriers to protect the beaches; formation works of the industrial lakes, 4 inlet bridges, 3 residential towers and the infrastructure works. On the other hand, the AC is constructing 3 bridges on South Marina Road to avoid the intersections of the Coastal Road/the Railway/the Road of El Natroun Valley with the Road of South Marina as a continuation of the alternative El Alamein Coastal Road which executed by the AC and put into operation. In addition to these, the AC is carrying out the Hotel of the Armed Forces.