Eng. Mohsen Salah – AC Chairman toured Al Fatah Al Aleem Mosque in the New Administrative Capital, to follow up the execution status for all the project items and the fulfillment of the time schedule and gave his instruction to coordinate with the different sides to avoid conflict of competence. The project is consisting of: a basement including the mosque nave which accommodates for 6300 prayers – 6 entrances – aside entry for the women praying area on the First floor – external praying area accommodates 3400 prayers, men praying area (1200 prayers); women praying area (300 prayers), 2 ablutions for men and the same for women; Heavenly Messages Museum, Quraan Memorization House, a medical care unit. In addition to these, the mosque includes 4 minarets with 90 m height for each one, a main dome for the mosque nave 33 m diameter - 28 m height, 4 secondary domes for the mosque nave 12,5m diameter - 10 m height. Then Eng. Mohsen Salah – AC Chairman, Eng. Emam Afifi, Eng. Khaled Eissa and Eng. Mahmoud El Sharnouby toured the Parliament Project, the rate of the completer concrete works reached 67% of the total 135,000 m3 of concrete and the ongoing works is in full swing. The parliament is built upon 28 feddans including the building of the parliament: the main building built upon 18,000m? comprising the main hall with 50m diameter which accommodates 1000 preliminary and offices for 3200 employees with a height 65m; a basement – a ground floor – 8 typical floors – 2 domes with 57m diameter on 123.700m?; services buildings which includes 2 storeys car park accommodate 1500 car - a medical center which consisting of: a ground floor – a security building – a maintenance building – an power station (generator-transformers-distributor) – an electromechanical services building – a firefighting station – a mosque accommodates 300 prayers – fences 1400ml – 2 main entries – 4 aside entries – greenery areas.