Wastewater project of El Tarawy El Bayad Abou Mandour villages in Kafr El Sheikh - Egypt

Administrative Buildings   ::  Completed Projects   ::  2021  ::  

Client: Kafr El Sheikh Water Supply and Sanitation Company (KSWSSC). 
Consultant of the client: Engineering Consultants Group ECG.
Contract value: LE 95 million + 426 thousand euros.
The project entered service on 5/1/2021 for Abou Mandour and El Bayad stations by the electrical current, and El Tarawy plant operated by diesel till the electricity company release the electrical current.

Project components:
First: lifting stations:
El Tarawy: 4 m-diameter pit + annexed buildings.
El Bayad: 4 m-diameter pit + annexed buildings.
Abou Mandour: 6 m-diameter pit + annexed buildings.
Second: force mains:

El Tarawy: 1750 m length, HDPE pipes diameter 180 mm.
El Bayad: 4382 m length, HDPE pipes diameter 315 mm.

Abou Mandour: 6986 m length, HDPE pipes diameter 500 mm.
Third: gravity networks: 29368 m of UPVC pipes with different diameters.
- 114 m of reinforced concrete pipes with a diameter of 700 mm.


Fourth: house connections: 16447 m length of UPVC pipes, diameter 160 mm.