Al-Galaa Tunnel - Giza - Egypt
Tunnels
:: Completed Projects
:: 1985 ::
It was completed at a standard rate in 6 months. The total length of the tunnel is 600m, the width is 15.8m, the length of the covered part is 150m, and the internal height is 6m.