AC Logo
 
AC Worldwide
AC Worldwide
 
   
Machinery and Equipment
  About Us
Skip Navigation LinksHome : About Us : Resources : Machinary & Equipment
machinary and equipment

Part of Arab Contractors competitive advantage comes from adopting efficient equipment management system , which looks mainly for minimizing downtime. This successful system is based on :

  • Development in direction of add–on– reliable equipment , and purchasing the latest technology .

  • Short – list procurement policy of internationally recognized manufacturers. Economic replacement policy , which ensures operating fleet within its profitable life time.

  • Organization structure comprises a rental department to satisfy and fulfil projects unique needs and urgent cases , in order to avoid any delays.

  •  Mobile and stationary maintenance and repair workshops, besides imposition of operation and maintenance software covers all mechanical management levels.

  • Preserving equipment top performance through an overhauling plan carried out by three central overhauling workshops.

  •  Recruitment of competent operators and technicians. Continuous upgrading training program. Scrap the non-profitable equipment.

Related Information
Quick Links
Latest News
May 20, 2019 |The Minister of Youth and the President of the Egyptian Football Association inspected the upgrading works of Cairo International Stadium as a preparation for AFCON 2019
Dr. Ashraf Sobhi – the Minister of Youth and Sport and Eng. Hany Abo Rida - President of the Egyptian Football Association and the Head of the Organizing Committee inspected the ongoing preparation a.... Read more
May 19, 2019 |The Prime Minister and the Minister of Youth inspected the upgrading works of Cairo International Stadium ahead of AFCON 2019
May 15, 2019 |President Abdel Fattah El Sisi inaugurated "Tahya Masr" Axis and the Arab Contractors Company received Guinness World Records Certificate for "Tahya Masr" Bridge the World's Widest Cable Stayed Bridge
May 15, 2019 |The Press Conference of the Chairman of the Arab Contractors Company and the Regional Director for the Guinness World Records in the Middle East after the inauguration of "Tahya Masr" Axis
Read All News
Total Equipment Cost 5906  L.E. Million